Cokerexpo have recently revisted Bristol Robotics Lab at Bristol University to upgrade there aluminium structure.
The truss structure with stand above a full size house which is being built below it.
This project is for those requiring special needs and house adaptions, the truss frame with carry lights and cameras to document various designs and options.
Here we used our System 50+ Trio gantry system, a heavy duty range for longer spans between legs and the ability to carry higher weight loads.
Here we used four super tower lifts to raise the frame in increments adding in the split staged legs as we go higher, nice and easy.
The use of four lifts means a slow and controlled raise with all personnel safe and sound, a must with H and S requirements.